Contractors are working to improve streets for walking and wheeling as part of a £21m project.
The lower section of Pinstone Street will be shut until June 2026 to create a ‘cycle street’. Work started there in August and quickly uncovered old tram tracks.
New paving is also being laid on Pinstone Street outside the Town Hall. And Surrey Street is being pedestrianised.
The work is part of Sheffield City Council’s £21m Connecting Sheffield project to improve public spaces and walking and cycling routes on Charles, Pinstone and Surrey streets and Arundel Gate.
A section of Pinstone Street from the Town Hall to the Peace Gardens was closed to traffic in 2020.

5. Hotel
New paving is being laid on Pinstone Street near the Town Hall, Peace Gardens and Radisson Blu hotel. This section was a busy bus route but was closed to traffic in 2020. | nw Photo: dw

6. Road Closed
Barriers, cones and signs at roadworks to pedestrianise a section of Surrey Street. | nw Photo: dw

7. Kerbs
Surrey Street boasts several listed buildings and is one of Sheffield's best. New kerb stones are being laid to create a bike and pedestrian route that excludes traffic and links to Pinstone Street. | nw Photo: dw
.jpeg?crop=4:3&trim=&width=800)
8. Greening
An artist's impression of how Pinstone Street will look when it reopens as a 'cycle street' with greening and trees. | nw Photo: dw


