Backlog for pothole repairs across England and Wales tops £18bn with local roads branded 'a national disgrace'

The backlog for pothole repairs across Yorkshire and the Humber has topped £1.8bn with residents warned there is “no easy fix.”

An annual report by the Asphalt Industry Alliance (AIA) published today (March 17) says the state of local roads in England and Wales is a “national disgrace.”

An annual survey by the Asphalt Industry Association says England and Wales now faces a backlog of £1.8bn to repair its local roads.placeholder image
An annual survey by the Asphalt Industry Association says England and Wales now faces a backlog of £1.8bn to repair its local roads.

Yorkshire and Humber now faces a £1.83 billion backlog of carriageway repairs, and one in six roads across the region have “less than five years’ structural life remaining.”

“I think all road users would agree that the condition of our local roads has become a national disgrace,” said David Giles, Chair of the Asphalt Industry Alliance (AIA), which commissioned the annual study, known as the Annual Local Authority Road Maintenance (ALARM) survey.

“Tracking data over the last decade shows the amount needed to bring local roads up to scratch has increased dramatically, and the impact of frequent adverse weather events on a consistently underfunded – and increasingly fragile – network are coming home to roost.”

The report pointed to the impacts of one of the wettest winters on record for deteriorating roads even further.

Sheffield musical theatre singer Jack Hutchinson shared how his tyre was shredded by this pothole on the Tinsley Roundabout on February 16. The roundabout is one of the busiest in Sheffield and makes up J34 of the M1 motorway.placeholder image
Sheffield musical theatre singer Jack Hutchinson shared how his tyre was shredded by this pothole on the Tinsley Roundabout on February 16. The roundabout is one of the busiest in Sheffield and makes up J34 of the M1 motorway. | Jack Hutchinson

It comes after Sheffield called an all-councillors meeting in February under the weight of complaints from residents and MPs about potholes in the city, with criticisms aimed at the ‘Streets Ahead’ contract operated by Amey.

The 25-year-long contract was signed in 2012 and is worth £2bn, but means Sheffield is largely cut out of any new additional funding from the Government.

Sheffield Council figures show that the number of potholes, and pothole repairs, have tripled in recent years.

Estimate number of Category 1 (severe, dangerous) potholes filled:

2020/212021/222022/232023/242024/25
2,3482,7072,8625,7626,179

Estimate number of Category 2 (not dangerous) potholes filled:

2020/212021/222022/232023/242024/25
2,4481,5391,6501,5865,770

Meanwhile, the ALARM 2026’s findings for Yorkshire & the Humber show that in 2025/26:

· £1.83 billion is required, as a one-off, for local authorities in the region to bring the network up to their ‘ideal’ conditions.

· More than 8,000 miles (43 per cent) of the network in Yorkshire and Humberside is reported to have less than 15 years’ structural life remaining.

· 174,398 potholes were filled over the last year at a cost of £13.7 million.

Sheffield Council leader Tom Hunt, speaking in his role as chair of the Inclusive Growth Committee for the Local Government Association, said: “More funding being directed towards fixing roads, alongside some longer-term certainty is positive. However, the fact that councils still face an £18.62 billion backlog of local road repairs, shows more action is needed for councils to bring roads up to scratch.”

AA President Edmund King OBE said: “The ALARM 2026 report starkly warns us how much more needs to be done to eradicate this plague of potholes. We have been seeing with our own eyes, and feeling with our wheels, how record wet weather linked to substandard roads has led to many local roads becoming patchwork obstacle courses.”

AIA Chair David Giles added: “Local authority highway engineers have told us they are cautiously optimistic that the increased funding announced by the Government, supplemented by their own coffers, should help them stem further decline, but it is not the silver bullet that will enable them to clear the backlog of repairs any time soon.”

Related topics:
News you can trust since 1887
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice