The mild spell of weather helped the Corporation Engineers with their job of rebuilding the bridge over the canal at the bottom of Staniforth Road in January 1954.  Half of the bridge was completed and two months more should see the job finished.  Our picture shows a gang of workmen hard at work laying a stretch of reinforced concrete and helping to get the section completed before rain or frost arrived.  This had to be done in one piece as it could not be jointed.placeholder image
The mild spell of weather helped the Corporation Engineers with their job of rebuilding the bridge over the canal at the bottom of Staniforth Road in January 1954. Half of the bridge was completed and two months more should see the job finished. Our picture shows a gang of workmen hard at work laying a stretch of reinforced concrete and helping to get the section completed before rain or frost arrived. This had to be done in one piece as it could not be jointed.

Sheffield retro: 16 classic photos looking back at Sheffield canals

This week, retro takes a trip around Sheffield Canal and Canal Basin.

From school children enjoying trips on barges to prisoners of war breaking up ice, these 16 black and white images take a look back at life on Sheffield’s canals.

Related topics:
News you can trust since 1887
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice