Trains suspended as lorry stuck under bridge

0
Have your say

TRAIN services between Sheffield and Barnsley were disrupted this morning when a bin lorry stuck a railway bridge at Worsbrough.

The lorry got stuck under the bridge on Hunningley Lane at around 7.40pm, affecting trains on the railway line above.

Trains were back to normal by lunchtime.

The bin lorry ran into difficulty at around 6.55am when the mechanism on the back began to lift up as it travelled under the bridge.

Back to the top of the page