Help Sitemap Home Skip Navigation Contact Us Disability Statement

 
 
Sunday, 23rd November 2008

Premium Article !

Your account has been frozen. For your available options click the below button.

Options

Premium Article !

To read this article in full you must have registered and have a Premium Content Subscription with the Sheffield Star site.

Subscribe

Registered Article !

To read this article in full you must be registered with the site.

FLOODS ONE YEAR ON: Where will the planned defence schemes go?



Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image

Published Date: 25 June 2008
Here are South Yorkshire and north Derbyshire's planned flood defences:
Sheffield

- Hundreds of thousands of pounds spent clearing rivers, including tree clearance along River Don between Owlerton and Kelham Island, dredging of the Don at Oughtibridge, removal of 40 years of silt deposits and old timb
er from River Loxley, Hillsborough.

- Flood defence wall at Kelham Island.

- Work to reduce flood risk on Blackburn Brook, Chapeltown, including better maintenance, clearing debris, increasing the size of a storage area for flood water at Devil's Bridge Pond, modifying a bridge near Chapeltown park to increase water capacity beneath and extra rainfall gauges to monitor flood risk more closely.

Doncaster

- £2.6 million this financial year to reduce the flood risk to 500 properties.

- Work to improve resilience of Bentley Ings pumping station that was flooded last June.

- Rebuilding of a section of Bentley washlands embankment - which needed shoring up with giant sandbags - to reduce flood risk in Bentley and Toll Bar, plus replacement of 160m of flood defence along the River Don.

- Replacement of large penstock sluicegates on Bentley Ings that were stolen for sale as scrap metal.

- Sinking of 500 concrete piles for new flood defences at Stainforth.

Rotherham

- Construction of new washlands between Magna Centre and town for storage of excess water to prevent river bursting its banks, plus better defences.

Barnsley

- More than £1 million to repair and improve embankments at Houghton washlands - a flood storage reservoir upstream of Darfield on the River Dearne, where a 270 metre-long bank will be rebuilt and the sluice from the river extended and improved.

Chesterfield

- Study of River Hipper, in the west of the town, to look at management options. Two public meetings have been held.

- Strategic project on River Rother near The Avenue coke works site.

(The Environment Agency spent £547,000 in 2007-8 and will spend £594,000 in 2008-9 on improvements to warning and measurement systems)

What do you think? Add your comment below.

Relive the moment the rains came with your photos and videos from the time
Dramatic video of woman's bid to cross the flooded Wicker
Video footage as despair hits some of the area's worst flood victims
Your flooding pictures: Ulley Dam, Swinton, Chesterfield
More photos sent in by readers immediately after the flood
See the pumps in action as South Yorkshire struggled to recover

Read more of our coverage from the first anniversary of the floods
Only Sheffielders could laugh through this - VIDEO
Never again: South Yorks promised vital work
Flooded out, looted twice ... and then came baby Charlie
Staggering 577 calls to firefighters
Owls winning repair battle
Council 'sorry' for road repairs delay
Prince visit morale boost
Main news index
Letters
Check out the very latest on South Yorkshire's roads - including live traffic cameras on Sheffield's commuter routes - with our Traffic section
Latest sport.



The full article contains 483 words and appears in Sheffield Star newspaper.
Page 1 of 1

  • Last Updated: 25 June 2008 9:42 AM
  • Source: Sheffield Star
  • Location: Sheffield
 
 

Comment on this Story

 

In order to post comments you must Register or Sign In

 
 
 
  

 
 


Sister Newspapers:
Press Complaints Commission

This website and its associated newspaper adheres to the Press Complaints Commission’s Code of Practice. If you have a complaint about editorial content which relates to inaccuracy or intrusion, then contact the Editor by clicking here.

If you remain dissatisfied with the response provided then you can contact the PCC by clicking here.