Help Sitemap Home Skip Navigation Contact Us Disability Statement

 
 
Monday, 12th May 2008

Premium Article !

Your account has been frozen. For your available options click the below button.

Options

Premium Article !

To read this article in full you must have registered and have a Premium Content Subscription with the Sheffield Star site.

Subscribe

Registered Article !

To read this article in full you must be registered with the site.

Protest over power line in rail tunnel



Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image

Published Date:
18 December 2007
MINISTERS are facing mounting pressure from MPs to scrap plans to run a huge electricity power line through the disused Woodhead railway tunnel linking Sheffield with Manchester.
Campaigners say the Government-approved plans by National Grid to plant the cables in the trans-Pennine tunnel would prevent the route, which has been closed since the 1980s, from ever being reopened.

Under Sheffield's Economic Masterplan - the 15
-year blueprint for the city's development - better rail links across the Pennines are crucial.

Now 21 MPs, including Sheffield Hillsborough's Angela Smith, have signed a parliamentary motion demanding the Government intervene and "prevent this strategic rail route being lost forever".

Ms Smith told The Star: "We want to be sure the short term interests of the National Grid do not compromise the long term interests of the Northern economy."

Graham Stringer, the MP for Blackley in Manchester who tabled the Early Day Motion, added: "If we are going to increase rail capacity we have to reopen lines like the Woodhead tunnel.

"Without doing that, we cannot reach any of the projections the Government is predicting."

There are three separate tunnels on the Woodhead route, between Woodhead in Derbyshire and Dunford Bridge, near Penistone.

At the time of its completion in 1845, Woodhead 1 was one of the world's longest railway tunnels at a length of three miles and 13 yards.

The construction of the tunnel claimed the lives of 26 men, injured another 140, and cost more than three times the original estimate of £60,000.

The last passenger train used the route in 1970 and it closed to freight trains in 1981.

Professor David Begg, of the Northern Way economic development group, said the future of disused rail infrastructure was "critical" in the economic future of the region.

A Department for Transport spokesperson said the Government had no plans to reopen existing lines but "would not rule out strong proposals".

What do you think? Add your comment below.

Main news index



The full article contains 335 words and appears in Sheffield Star newspaper.
Page 1 of 1

  • Last Updated: 18 December 2007 7:22 AM
  • Source: Sheffield Star
  • Location: Sheffield
 
Prev
1
Next
1

Lewis Skinner,

Hillsborough 18/12/2007 13:08:12
The plans should be scrapped. The Woodhead Line was one of the first electric high-speed passenger lines, and it's a travisty it was closed in the first place (Beeching himself actually proposed this route remained open). It seems the only reason it was closed was that it was deemed "too good" for northerners by the powers that be in Westminster and Whitehall, and now they're planning on ensuring northerners can never have the high-quality that those south of the Watford Gap enjoy. Re-open Woodhead to passenger trains now!
Prev
1
Next

 
  

 
 

Today's Vote

Could you be a foster parent?
Yes
No

Featured Advertising



Sister Newspapers:
Press Complaints Commission

This website and its associated newspaper adheres to the Press Complaints Commission’s Code of Practice. If you have a complaint about editorial content which relates to inaccuracy or intrusion, then contact the Editor by clicking here.

If you remain dissatisfied with the response provided then you can contact the PCC by clicking here.